Concrete quality requirements
①Concrete curing should be timely. In the process of concrete pouring, in order to reduce the exposure time of the concrete surface and prevent the evaporation of water on the concrete surface, non-absorbent materials such as plastic film can be used to pour and cover while pouring.
② If artificial watering and spraying are used for maintenance, the concrete surface can be covered (wrapped) tightly with water-absorbing materials such as geotextiles, sacks, cotton felt, etc., without showing edges and corners, and the interval between watering and spraying is short. Moisture is maintained throughout the cover, inside and out, to prevent wet-dry cycles. Generally speaking, the curing water temperature should not be lower than 15℃, and the difference between the curing water temperature and the surface temperature of the concrete should not be higher than 15℃ to prevent cracks on the concrete surface.
③ If the concrete surface is wrapped with plastic film for moisturizing and curing, the plastic film should have certain crack resistance, tensile strength, and flexibility. After the concrete is demoulded, the concrete surface should be sprinkled with water to moisten it, and it should be wrapped tightly immediately. The plastic film should be close to the concrete surface, without leakage or ventilation. During the curing period, water beads will appear on the concrete surface throughout. In order to keep the concrete surface moist, water can be sprayed into the plastic film regularly, and the integrity of the film should be checked frequently. If the plastic film is found to be cracked, etc., it should be repaired in time.
④According to different weather, temperature conditions and different structural characteristics, the curing period of high performance concrete should generally be controlled within 14 to 28 days. During this curing period, insulation curing measures should be adopted to ensure that the curing humidity of the concrete meets the requirements, so that the hydration of the concrete can proceed smoothly.
⑤ The maintenance of high-performance concrete should be in charge of a special person, and a special responsibility system should be established. During the maintenance period, it is necessary to inspect and inspect in time, find problems, solve them in time, pay attention to details, make records, and fully implement maintenance measures.