Anti-corrosion construction methods for steel structures such as furnace racks and storage tanks

Leave a message

Anti-corrosion construction methods for steel structures such as furnace racks and storage tanks


1. Brush the rust-proof primer with rust and anti-rust primer twice for the steel structure such as stove frame and storage tank;

For steel structures such as furnace racks and storage tanks, the rust layer on the surface is removed by manual rust removal combined with mechanical grinding and rust removal, and the cleanliness is required to reach Sa3 specified in "Steel Surface Corrosion Grade and Derusting Grade before Coating" (GB/T8923). The roughness is required to reach the M level specified in "Assessment of Steel Surface Roughness Grades Before Coating (Comparative Sample Method)" (GB/T13288). For construction sites that do not have rust removal, the surface treatment is to use wire brushes, shovels or coarse sandpaper to polish and remove rust, but the cleanliness must meet the requirements of "Rust Grade and Rust Removal Grade on Steel Surface Before Painting" (GB/T8923) St3 level. The order of surface rust removal treatment is generally first inside and then outside; first up and then down.

2. Construction and control of steel structures such as furnace racks and storage tanks

The anti-corrosion coating construction of steel structures such as furnace racks and storage tanks is mainly carried out by brushing, roller coating, etc. The working environment for anti-corrosion construction should be spacious and bright, with good ventilation, and rain and windproof facilities should be provided when necessary. During construction, pay attention to:

1. Pay attention to safety when working at heights, and place necessary scaffolding and scaffolding.

2. Welds with obvious unevenness should be repaired and smoothed to make them smooth.

3. For the openings, free edges, corners and other positions, it is necessary to paint multiple times to ensure that the thickness of the coating layer meets the design requirements.

4. Clean up the site after construction is completed.

5. The construction should be suspended when the weather temperature changes suddenly, and the construction can be resumed after the weather temperature is normal.

Third, the specific method of repairing paint defects:

Unqualified positions are found in the on-site construction inspection and should be repaired in time. The repair method is to use sandpaper or grinding wheel to roughen the coating coating at the leaking point or thin coating position and the surrounding radiation area of 5cm, and then repaint. After curing, check the leak point and thickness again until qualified.