The transportation of the baffle door is the same as the assembly. During single-section transportation, all accessories should be protected from damage. The baffle door must be stored on a dry horizontal surface. The baffle door can only be hoisted by lifting lugs. Avoid bending and deformation of the baffle door, that is, add square wood supports on a flat ground. The support point is on the frame around the baffle door. The distance between the supports must be appropriate to avoid the deflection of the baffle door. There must be enough distance between the baffle door and the floor to avoid the interference and pollution of accessories such as the swing arm of the baffle door.
The baffle door is cut with gas cutting to cut the original rectangular flue. Before cutting, the exposed insulation material shall be covered with fireproof cloth to avoid fire. The axis size and elevation of the steel structure installation shall be reviewed, and the measurement technicians shall be organized to set up and mark. Mark the opening position and the flat steel position on the concrete flue, and manually open the concrete flue hole. Before installation, check whether the baffle door bracket on the flue is safe and reliable, and whether the size meets the requirements.
When the baffle door is closed, heating and sealing air is required. Before installing, debugging, maintaining or inspecting the baffle door, the personal safety of the installation and maintenance personnel should be ensured. The area where the flue and the baffle door blades are connected is a dangerous area. The baffle door should stop before installation, debugging and maintenance. Flow in the flue, and ensure that the actuator is powered off, and the baffle door prevents the actuator from malfunctioning.
